|
|
|
| Projects
|

  REFERENCES
 
 
Semptember 2006
Siemens – power station

Contract for all electrical / I & C works for the 1000MW combined cycle power station consisting of 4 gas turbines and 2 steam turbines. main works : 220kV generator step-up Transformers; 780 meters of 15KV Isolated phase busduct; 15.5 KM of MV Cable, 161 KM of LV Cable, 195KM of signal and FO Cables.

November 2007
Sidem – Hidd desalination plant

E&IC installation works which included 27.0 KM of MV Cable, 230 KM of LV cable and 330 KM of signal and FO cables. Also, I&C works for the evaporator, electro - chlorination plant, blending plant, Potabilisation Plant and demineralization plant control system.

September 2008
Voltas limited - Bahrain City Centre

The Bahrain City Centre has been constructed in Al Seef district, and our company had several missions in design, procurement, delivery, installation, testing and commissioning of electrical Works, which included more than 50 11kv transformer, 162 km of LV cables and 635 HV Terminations.

     
November 2008
FOSTER WHEELER – Refinery gas desulphurization project

Our Company’s Electrical work involves Installation, Testing & commissioning of 4 No 11KV / 6.6 KV transformers, MV & LV switchgears & distribution Panels (40 Nos), MV/LV Power & control cables (110 KM) & Plant lighting (600 Nos). Instrumentation work involves Installation, calibration & testing of 1200 Field Instruments including 160 KM of Control cables, 115 Junction Boxes, 8 KM of impulse & air tubing work.

April 2009
AMA – Hidd Port

Supply install, testing & commissioning of 2 HV Switching Station and 25 11KV substations, which works consisted of: 11 KV Switchgear panels, Ring Main Units, 11KV / 400V Transformers, LV distribution panels and fuse boards, 34 kM of MV cabling, 40 High masts (40 m height) for Lighting, 360 Street light Poles and 66 kM of LV cabling.

August 2009
Bahrain Financial Harbour B.S.C

The Bahrain Financial Harbour is located in the centre of Manama. Our electrical work involves supply / install / testing & commissioning of 11KV network with MV cabling (30KM), Intake substations with 11KV VCB panels, MV equipments such as Ring Main Units & Transformers of various ratings.

     
November 2009
KOOHEJI – Durrat Al Bahrain Resort Project

Entire electrical works for 160 Villas of Atoll 2 of Durrat Al Bahrain project involving installation & commissioning of LV power cables, Distribution Panels & Boards,Switches & Sockets, Metering Cabinets, Fire Alarm system etc.

July 2010
Bahrain Bay development B.S.C

Our company’s works involves supply / install/testing & commissioning of 05 Nos 11KV substations with MV equipment such as 11KV ring main units, transformers of various ratings, MV cabling (20 KM), LV distribution panels, fuse Boards, LV Cabling (10 KM) for connections to various utilities.

August 2010
ALBA – Crane Bus Bar Replacement

Replacement of the existing Crane bus bars in Pot Line 1 to 3 including installation & commissioning of LV power cables, Aluminium busbars, isolators, GRP Cable Ladders etc.inside the pot rooms.

     
September 2010
Lulu Tourism company – Reef island

Our electrical work involves supply / install / testing & commissioning of 34 Nos 11KV Substations with MV equipment such as 11KV VCB Panels, Ring main Units, Transformers of various ratings, MV Cabling (30 KM), LV Distribution Panels, Fuse Boards, LV Cabling (15 KM) for connections to villas, Apartments and residential towers.

November 2010
AMA – Pumping Stations

Hidd FS, Salmabad FS, Tubli DS and Buquawah DS. Our company works are as such : Design, procurement, delivery, erection, testing and commissioning of MV Switchgear, Transformers, MV VSD, LV VSD, LV Switchgear for new pump systems, LV Soft Starters, modification/adaptation of existing LV panels to meet refurbished pumps and/or replacement of pumps, UPS for Control & monitoring, cabling works etc.

 
 
     
 
|
|
|
| Projects
|