COMSIP Al A'ALI has implemented many prestigious projects in Bahrain and Qatar associating with companies of international repute.

References in Qatar (Projects Under Execution)

SIEMENS –RasLaffan, 1025 MW Power Plant, E&I Works including temporary construction power 700 KVA, LAN and telecommunication packages.

AIR PRODUCTS PLC–RasLaffan, Oryx GTL project, Air separator units, E & I installation.

CBI EASTERN ANSTALT –RasLaffan, RasGas expansion phase 1A, LPG storage tanks (T001 and T002), E & I installation of the 2 storage tanks.

CBI EASTERN ANSTALT –RasLaffan, RasGas expansion phase 1B, LPG storage tanks (T003 and T004), E & I installation of the 2 storage tanks.

VOLTAGE ENGINEERING –Abu Samra, fiber optic cables splicing, jointing and testing.

ARCHIRODON Construction–Mesaieed, EPIC of topside facilities to MBP, fiber optic cables installation.

MABANI–RasLaffan, water pipelines, fiber optic cables installation (150Km).

AL BALAGH Trading & Contracting Co–Dukhan, tie in of new source well at PWI 3, E & I installation.

References in Bahrain (Projects under Execution)

ALSTOM POWER(Switzerland) –Erection, Testing Commissioning support for Electrical & Instrumentation work for 700 MW ALBA Power Station No.4 (PS4) for ALBA Potline5 Expansion Project.

SOLIOS CARBONE–Supply, Erection, Testing, Commissioning of Electrical & Instrumentation work for Paste plant, Carbon Recycling plant, & Liquid pitch plant for ALBA

Potline5 Expansion project.

SOLIOS Environment–Supply, Erection, Testing, Commissioning, of Electrical & Instrumentation work for Fume treatment & Gas Treatment Plant for ALBA Potline5 Expansion project.

INTERNATIONAL BECHTEL CO–Supply, Erection, Testing, Commissioning for Electrical & Instrumentation work of Anode Bake furnace & Anode Storage Buiding for ALBA Potline5 Expansion project.

INTERNATIONAL BECHTEL CO–Supply, Erection, Testing, Commissioning of Construction Power System for ALBA Potline5 Expansion project.

CEGELEC SA (France) -BAPCO (Bahrain Petroleum Co.) Modernization of Instrumentation and Control -LSFO, FCCU complexes

References in Bahrain (Projects Executed)

ALSTOM POWER(Switzerland/Italy) -Erection, testing, commissioning support for Electrical and Instrumentation Work for 700 MW Hidd Phase II Power Plant.

AlstomT&D(France) -Erection of Hidd 220KV Substation Extension (Phase II)

AlstomT&D(France) -66KV Transmission Development: Erection of 66KV Substation-switchgears for new and existing substations.

ABB ELEKTRIK SANAYI A.S(Turkey) -66KV Transmission Development: Erection of Transformers for new and existing substations.

ABB SADELMI SpA(Italy) -Electrical and Instrumentation of 280 MW HiddPower Station (Phase I)

ALSTOM T&D(France) -Upgrading of System Control Centres of Electricity and Water Ministry of Electricity and Water.

COGELEX ALSTOM(France) -Erection of Hidd220KV substations (Phase I).

ALBA (AluminiumBahrain) -Supply, installation and testing of HV Switchgears at HTS 23, 24 and 25.

JGC Corporation(Japan)

  • Electrical and Instrumentation of BAPCO Kero-Mero Unit
  • Electrical and Instrumentation of BAPCO In-Line Blending Project

Project Details

ALBA Line 5 Expansion Project

Combined Cycle Power Station PS4 E & IC Works Sub-contract received from Alstom (Switzerland) for all Electrical / I & C works for the 700MW Combined Cycle Power Station consisting of 3 Gas Turbines and 2 Steam Turbines. Contract value US$ 6.0 million.

E&IC installation works comprising:

  • 220KV,235MVA Generator Step-up Transformers.
  • 410 Meters of 15KV Isolated Phase Bus duct.
  • 800 KM of MV, LV, Fiber Optic and Instrument Cables.
  • 30 KM of Cable Trays.
  • MV and LV Switchboards, Station Service Transformers, Unit Auxiliary Transformers and Auxiliary Transformers, Generator Circuit Breakers, PT Cubicles, Neutral Point Cubicles, Electrical Modules.
  • Fire detection system in the turbine hall and the electrical annexes buildings.
  • Gas monitoring system
  • 6.6kV, 6.0 MVA Black Start Diesel Generator.
  • Electrical works for HVAC System in the electrical annexes and the control room.
  • I&C works for the GT and ST control system including DCS panels, I/O Panels, communication network, GPS antenna and clock system, operator consoles and HMI, field mounted junction boxes and instruments, impulse tubing, calibration of instruments and loop checking.
  • Design, Supply and Installation of Lighting and Small Power System for the entire Power Station PS4 consisting of :
  • normal lighting system

  • emergency lighting system

  • socket outlet system

  • distribution panels.

  • Design, Supply and Installation of Communication System consisting of:
  • direct wire telephone system.

  • IT network in building and offices.

  • public telephone network.

  • Design, Supply and Installation of construction power supply consisting of:
  • transformers, cables and distribution panels.

  • Supply and installation of primary earthing system:
  • underground earthing grid

  • thermo weld joints and earth rods

  • lightning protection system.

  • Construction period Feb. 2004 to March 2005.

ALBA Line 5 Expansion Project

Rectiformer-R47 –Installation Works

Sub-contract received from ABB (Switzerland) for all Installation works related to 72kA, 1580VDC Rectiformer/Transformer unit.

Contract value US$ 180 thousand.

Installation works comprising:

  • 72kA, 1580VDC Rectiformer/ Transformers.
  • Rectifier, Cooling Equipment and Control Panels.
  • 132kV GIS Bay•DC Isolators and Aluminium Busbars
  • LV Switchboards, Cable Trays and Cables
  • Water Deluge System.
  • HMI-System in PS3 Control Room.

ALBA Line 5 Expansion Project

E & I Works for Paste Plant

Sub-contract received in December 2003 from Solios Carbone, France.

Contract value US$ 2.65 million.

Scope: Installation of free issue items such as LV panels, instruments, pneumatic panels, PLC equipments etc. supply & installation of CCTV systems, 27nos. of distribution boards, 184 nos. of LCS/LCP, 90 nos. of instrument junction box, 7,750 mtrs of cable ladder / trays, 9,750 meters of conduits, 150 KM of power, control, instrumentation & lighting cables, 8500 nos. of terminations, 1225 nos. of light fittings etc.

Construction period April 2004 –Jan. 2005.

ALBA Line 5 Expansion Project

11.5KV Temporary Construction Power.

Contract received from International Bechtel Co. for design, supply, install, pre-op testing and startup for the 11.5kV construction power.

Contract value US$ 1.0 Million.

Design, supply and installation comprising:

  • 3.0 KM of 11.5KV Overhead Transmission Line.
  • 4.2 KM of 11.5KV Direct Buried Cable Circuit.
  • 10 Nos., 11.5kV/400V, 500kVA Transformers.
  • 9 Nos. of Ring Main Units.
  • LV Cable Circuits.
  • LV Switchboards.

BAPCO In-Line Blending Project:

Sub-contract for engineering, procurement and construction received from main contractor JGC in 1999. Sub-contract value US$ 1.7 million. Project completion in July 2000.

Scope included complete detailed engineering for field and control room installation, procurement of bulk materials, calibration & commissioning assistance to JGC for both electrical and instrumentation part. The scope also included all cabling & termination as well as loop checking of all I/O’s for the advanced computer control system.

BAPCO In-Line Blending Project:

Sub-contract for engineering, procurement and construction received from main contractor JGC in 1999.

Sub-contract value US$ 1.7 million.

Project completion in July 2000.

Scope included complete detailed engineering for field and control room installation, procurement of bulk materials, calibration & commissioning assistance to JGC for both electrical and instrumentation part. The scope also included all cabling & termination as well as loop checking of all I/O’s for the advanced computer control system.

BAPCO Modernisation of Instrumentation and Control of LSFO & FCCU:

EPC contract received in July 2000 by CegelecS.A./France in consortium with Comsip Al A’Ali. Main contract value US$ 31 million, Comsip Al A’Ali share US$ 12 million.

Cegelec scope:Overall project management, procurement, new blast resistant control building.

Comsip Al A’Ali’s scope: Detailed engineering, complete E&I installation, procurement of bulk materials, loop checking & commissioning assistance during “hot cut over”. Removal of old control and redundant field instruments.

Project scheduled for completion in March 2004, well ahead of schedule.

HIDD Power Station Phase I & II :

Sub-contract received in 1998 for Phase I (280MW)from ABB Sadelmi/Italy. Sub-contract value US$ 2.9 million.

Sub-contract received in 2002 for Phase II (630MW)from ALSTOM/Switzerland. Sub-contract value US$ 3.3 million.

Scope: Complete E&I installation comprising 210MVA, 220/15.75KV Generator Transformers, 220KV GIS, 11KV & LV switchboards, SCADA system, DCS panels including LAN network, marshalling panels, loop checking, calibration of instruments, lighting, earthing, lightning protection, intercommunication system.

Phase I construction period Sept. 1998 –Aug. 1999. Phase II construction period Feb. 2002 –Nov. 2003.

Ministry of Electricity & Water (MEW) Upgrading of System Control Centers of both Electricity and Water:

EPC contract received in 1998 by Alstom/France in consortium with Comsip Al A’Ali. Main contract value US$ 26 million + 1.7 million BHD, Comsip Al A’Ali share US$ 4.5 million.

Scope: Complete E&I installation comprising LV switchboards, SCADA system, telecommunication system, UPS, operator consoles, RTU’s, civil work for flow meter chambers, 67km of fiber optic cable laying, splicing & termination.

Construction period June 1998 –Oct. 2001

Ministry of Electricity & Water (MEW) 66 KV Transmission Developments:

Turn-key contract awarded in 2000 for the 66KV substation switchgear to AlstomT&D/France whereas the 66KV substation transformer contract was won by ABB Elektrik Sanayi/Turkey. Comsip Al A’Ali has been awarded the sub-contract for both switchgear and transformer installation work for 12 new substations and modification/addition in 30 nos. existing substations at US$ 2.92 million.

Scope: Installation of 57MVA/30MVA/20MVA transformers, 66KV GIS Bay, 33KV & 11KV switchgear, 220V & 48V battery, charger & distribution boards, SCADA system, telecommunication system, power & control cable laying, jointing & termination, fiber optic cable laying, splicing & termination.

Flour Daniel Intercontinental Inc. Cantonment Area at Sh. Isa Air Base, Phase-2:

Contract was awarded in January 2003 for Supply & Installation Works of Complete Power Distribution System in Cantonment Area of Air Base. The final contract value reached to US$2.25 million.

Scope: Detailed Design, Supply and Installation of HV RMU, Unit Sub-station (with HV Load Interrupter Switches, Oil Filled Transformers, LV Switch Gears), 11KV Cable Laying & Termination, LV Feeder Pillars, LV Cable Laying & Termination, Out Door Lighting.

Contract was awarded in January 2003 and work was completed in August 2003.

When it comes to Electrical and Instrumentation Engineering & Contracting COMSIP AL A'ALI is the partner you can rely on